New TopShim run:

version = topshim 2.0.0
date = 2023-01-20
time = 18:40:05.758
command = topshim 

FINE SHIMMING

Parameters:

probe = Z108618_0625
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.3 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  4: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  5: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.455

shim changes: 
Z	-47
Z2	+31
Z3	+77
Z4	-342
Z5	-1287

duration = 1 min 51 sec
completed successfully
finished Fri Jan 20 18:41:55 2023


========================================================================